Our Project Portfolio
Since 2016, we have executed critical infrastructure projects for every major operator in Pakistan. Here is how we turn complex challenges into operational success.
Coastal Solar Rollout (Balochistan)

Remote telecom sites in the coastal areas of Balochistan faced two major issues: zero grid connectivity and extremely difficult terrain for diesel logistics. The high operational cost (OPEX) of running generators 24/7 was unsustainable.
Constructed robust mechanical structures capable of withstanding high coastal wind loads.
Installed Solar PV systems integrated with Li-Ion batteries for autonomy.
Managed the end-to-end supply chain in one of Pakistan's most rugged terrains.
Project Outcomes
Achieved 99.9% site availability without reliance on the grid.
Drastically reduced diesel consumption and carbon footprint.
Securing the Network: Anti-Theft Rollout

With battery theft rising, Jazz needed a fortress-like solution to protect their assets. Additionally, their Core Data Centers required advanced monitoring to prevent downtime.
Supplied and installed over 2,000 Anti-Theft Cabinets equipped with triple-locking mechanisms.
Deployed Surge Protection Systems (SPD) and Earthing Mesh at key Data Centers.
Installed Infrared Cameras and DCIM software for real-time environmental monitoring.
Project Outcomes
Significant reduction in battery theft incidents across the deployed region.
Enhanced resilience of Core Data Centers against power surges.
Large-Scale Energy Storage Management

Managing the lifecycle of thousands of batteries across a country as large as Pakistan is a logistical nightmare. Operators needed a partner who could not just supply batteries, but manage them.
Delivered 12,500+ Li-Ion batteries to Enfrashare and 7,700+ to Telenor.
Integrated GPS trackers and Heating Films (for Northern areas) into the battery modules.
Developed a custom Web Application to track warranty claims, resolving over 700 claims.
Project Outcomes
Streamlined "Swap and Go" operations across regions.
Extended battery asset life through proactive health monitoring.
Mobility & Network Optimization

Zong required rapid network expansion capabilities for temporary events and emergency coverage, alongside a massive cleanup of their existing site infrastructure.
Mobilized and commissioned Cell on Wheels (COW) units for 200+ sites, providing instant coverage.
Deployed teams to 2,800+ sites to perform rectification, sunshade fabrication, and pad construction.
Project Outcomes
Improved network KPI through physical site rectification.
Enhanced agility in responding to network coverage demands.
Ready to Write Your Success Story?
We bring the same level of dedication and expertise to every project, whether it's a single site or a nationwide rollout.